Karnataka Solar Power Development Corporation Limited

                         

ಕರ್ನಾಟಕ ಸೌರ ವಿದ್ಯುತ್ ಅಭಿವೃದ್ಧಿ ನಿಗಮ ನಿಯಮಿತ

Charges payable by SPDs to KSPDCL for each block of 50MW
  
FINAL ISA
  
FINAL LSLA
  
Karnataka Solar_Connectivity intimation
  
Karnataka Solar_LTA intimation
  

  
Rev-4 Layout plan-dwg
  
Rev-4 Layout plan-pdf
  
Cordinates
  
Notification for commissioning of KSPDCL internal pooling stations
       
Proceedings of joint meeting for synchronisation of SPDs under JNNSM Scheme
       
Certification of Incorporation of KSPDCL
       
GoK notification dated 02-02-2016 for setting up of solar power generation in the solar park
          
GoK notification dated 11-04-2016 for setting up of solar power generation in the solar park
        
GoK notification dated 14-10-2015 for setting up of solar power generation in the solar park
      
GoK notification dated 16-05-2016 for setting up of solar power generation in the solar park
      
GoK order dated 12-06-2015 allocating 600MW to NTPC under bundling scheme to Karnataka in 2000MW Pavagada Solar Park
     
GoK order dated 13-06-2016 allocating 200MW solar generation plant with 15 minutes battery storage by Solar Energy Corporation Of India Limited in Pavagada Solar park
       
GoK order dated 29-10-2015 according in-priciple approval to establish 2000MW Pavagada Solar Park
    
Proceedings of the meeting held on 28-09-2015 with DC Tumkur regarding fixation of land lease rent
     
Pollution Control Board
  .
Allocation of 500MW NTPC JNNSM Scheme (Open Category) power to ESCOMs of Karnataka proposed in 2000MW Pavagada Solar Park Area
   .
     .
MNRE has proposed for development of Solar Parks and Ultra Mega Solar power projects to achieve development of One lakh MW of solar projects in the country.
 
Under this scheme for development of solar Parks in Karnataka, a JV company “M/s. Karnataka Solar Power Development Corporation Ltd (KSPDCL)” has been formed by KREDL and SECI. 11,000 acres of land has been identified at Pavagada Taluk in Tumkur District, Karnataka for this purpose.
 
In accordance with Gazette Notifications of GoK, KSPDCL is entering into Lease Agreements with the Land Owners for obtaining the required land of about 11000 acres for developing 2000MW solar park at Pavagada on annual lease rental basis.
 
KSPDCL, as a Solar Power Park Developer (SPPD) under MNRE guidelines vested for creating infrastructure like internal evacuation scheme, Layout Roads, Streetlights, Water, etc. for evacuating power generated from SPDs under plug and play model.
 
The solar park will be developed in 8 segments with a capacity of 250 MW each. One pooling substation of 220/66kV or 220/33kV is proposed for each 250MW segments for onward transmission of solar power. 250 MW segments is further subdivided into 5 blocks each having capacity of 50 MW. Each 50 MW block shall be connected to the solar park first at either 220/66kV or 220/33kV pooling substation through 66kV/33kV double circuit underground cables wherein the voltage will be stepped up to 220kV which will be further stepped up to 400kV at the proposed 400kV/220kV PGCIL station at solar park. Subsequently, the 400kV/220kV PGCIL station will be connected to 765kV/400kV PGCIL station located at Vasanthanarasapura in Tumkur and 400/220kV substation at Gooty in Andhra pradesh.
 
The entire Pavagada Solar Park has been divided into 40 blocks each of 50MW. The plot allocation in Pavagada Solar Park is as under:
 
Scheme Capacity in MW
NTPC under JNNSM   600
SECI under VGF 200
KREDL 1200
The LTA and Grid connectivity applications have been submitted by KSPDCL on behalf of SPDs to M/s. POWERGRID for according approval to evacuate the power generated at Solar Park to CTU grid. POWERGRID vide letters dated 11-04-2016 has granted LTA & Grid Connectivity approval to KSPDCL.
 
NTPC has finalized tender for establishing 600MW (500MW under Open and 100MW under DCR category) solar generation capacity in Pavagada Solar Park under JNNSM Scheme with the tariff discovered through reverse auction competitive bidding from the following bidders:
 
Name of the firm Capacity in MW
M/s. Yarrow Infrastructure Limited 50
M/s. Parampujya Solar Energy Pvt Ltd, 150
M/s. Fortum FinnSurya Energy Private Ltd, 100
M/s. ACME Rewari Solar Power Pvt Ltd, &
M/s. ACME Kurukshetra Solar Energy Pvt Ltd
100
M/s. ReNew Wind Energy (TN2) Pvt Ltd, 50
M/s. Tata Power Renewable Energy Ltd 150
Out of above 600MW solar generation, 450MW has been commissioned during Dec 2017 and 150MW during Jan 2018.
 
DISCOMs of Karnataka are beneficiaries for 600MW JNNSM scheme and 1200MW from the balance capacity, which is yet to be commissioned by SPDs through KREDL.
 
Balance 200MW to be commissioned by SPDs through SECI from the 2000MW Pavagada solar park, the target beneficiaries will be from SR.
 
Entire 2000MW from Pavagada solar park will be connected to the grid by June 2019.
 
KSPDCL, as a Solar Power Park Developer has initiated the following infrastructure works through bidding process:
 
Particulars Contract awarded to
Establishing 4 Nos of 2x150 MVA, 220/66kV Sub-stations M/s. L&T LTD
Establishing 4 Nos of 4x80 MVA, 220/33kV Sub-stations M/s. Amararaja Power Systems Ltd
Establishing 2x8 MVA, 66/11kV Sub-station M/s. Viji Power Transformers Pvt Ltd
Construction of Roads for a length of 75kms
M/s. KMC Constructions Ltd
Providing Street lights along the roads and Auxiliary supply to the 220kV Stations M/s. Kumar Electricals
Shifting, dismantling and re-arranging of DTC, power lines and arranging power supply to IP sets passing through 2000 MW Pavagada Solar Park in Rayacherlu and Tirumani Villages on TTK basis. Sri. Bhagya Electricals
Carrying out shift duties for 220kV/66kV Sub-station and 66/11kV substation having 11KV reference located at Pavagada Solar Park , Pavagada, Tumkur District Sri. Manasa Enterprises
Hiring of Manpower Services on contract basis M/s. Yes 24 Guarding & Facility Solutions Pvt Ltd
 
 